Robin America DY30 Service Manual page 21

Robin industrial engine service manual
Hide thumbs Also See for DY30:
Table of Contents

Advertisement

Se-
tuence
24
I
_
25
Item
Connecting
rod
Bearing hous-
ing and crank-
shaft
Procedures
Remove the connecting rod
from the crankshaft.
From the crankshaft remove
the key on the side of fan.
Remove the bolt fastening the
bearing housing.
Pull
the crankshaft together
with the bearing housing.
(Gently tap the side of crank
gear with plastic hammer.)
Remarks
No lock washer.
Be careful of the direc-
tion of rod. (Fan mark
is on the side of the
flywheel.)
Be careful of the setting
mark of the cap.
(See Fig. 26.)
Be careful of the copper
shim
and
"0" ring
be-
tween the bearing hous-
ing and the case.
Also be careful of the
hole for o i l .
Bolts,
nuts etc. used
8 x
22 7T bolt.
. .
6 pcs.
SW .
.
. 6 pcs.
After pulling out the
crankshaft from the
case, remove housing.
The bearing remains on
the crankshaft.
(See Figs.
27,
28 and 29.)
Fig.
26
Fig. 27
Fig.
28
- 1 8 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dy41Dy35

Table of Contents