Commissioning - Potterton Gold HE A Range Installation & Service Instructions Manual

Gold he a range condensing combination boiler
Hide thumbs Also See for Gold HE A Range:
Table of Contents

Advertisement

Screw
Pump
Fig. 63
Selector Switch
Display
Reset
Central Heating
Temperature Control
Fig. 65
34
© Baxi Heating UK Ltd 2008
Heat Exchanger
Automatic Air Vent
Fig. 62
Pump
Automatic Air
Vent
1
0
bar
Fig. 64
0
Domestic Hot Water
Temperature Control
1. Reference should be made to BS 5449 Section 5 when
commissioning the boiler.
2. Open the mains water supply to the boiler.
3. Open all hot water taps to purge the DHW system.
4. Ensure that the filling loop is connected and open, then
open the heating flow and return valves on the boiler.
5. Open the screw on the automatic air vent on the pump
body (Fig. 63).
6. The system must be flushed in accordance with BS 7593
(see Section 6.2) and the flushing agent manufacturers
instructions.
7. Pressurise the system to 1.5 bar (Fig. 64) then close and
2
disconnect the filling loop.
3
8. Turn the gas supply on and purge according to in GB BS
4
6891 and in IE I.S. 813 "Domestic Gas Installations".
Pressure Gauge
9. Test for gas soundness.
10. Hinge the facia panel upwards and refit the case front
panel. Tighten the securing screws.
2
11. Turning either of the temperature control knobs will set
3
4
0
the relevant temperature. When the knob is turned the
bar
display will alter and show the selected temperature. After a
few seconds the display reverts to show the current boiler
temperature (Fig. 65).

11.0 Commissioning

11.1
Commissioning the Boiler
IMPORTANT: The heat exchanger air vent on top of the
boiler (Fig. 62) MUST be opened before filling the
primary system.