Finalizing The Installation; Steps For Finalizing The Installation - Travis Industries GREEN SMART 864 Installation Manual

See through fireplace
Table of Contents

Advertisement

38

Finalizing the Installation

Steps for Finalizing the Installation

1.
Remove the glass (see page 40).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
NOTE:
If using firebacks, install them prior to adjusting the accent light deflectors.
3.
Carefully bend the accent light deflectors outwards to 45* (see "a" below). Take care to prevent damage to the
bulbs. Make sure the two accent light bulbs are in place. The assembly may be removed for bulb replacement
(see "b" below).
NOTE: .Take care to not touch the bulb with your fingers (use a cloth or paper towel).
4.
Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in
the owner's pack) into control panel light assembly (see the illustration below). The battery holder is held in place
with Velcro and may be removed for easier access.
Lift up and swing the lower
grill down to acces the area
below the firebox.
© Travis Industries
(for qualified installers only)
Swing the concealment
cover up and slide it back to
expose the controls.
AA Battery Tray
4090507
a
Battery Holder for
Control Panel Lights
AA
Battery
Holder
100-01217_000
b

Advertisement

Table of Contents
loading

Table of Contents